Preliminary Bid Opening Results are posted on this site as raw price data and are subject to further verification and validation for responsiveness and other evaluations. The listed apparent low bidder may not, in all cases, be the vendor awarded the contract. Note: These Preliminary Bid Opening Results are NOT listed in Bid/RFP sort order.

Preliminary Bid Results General (Goods/Services/Miscellaneous) Solicitations

Contract/Solicitation Contract Title/Solicitation Description
16221 Assorted Roadside Construction Signs - Two Year Requirements Contract
16092 Elevator and Escalator Maintenance Repair Services at All PATH Facilities, Stations and Shops in New York & New Jersey, 3 Year Requirements Contract - Revised
16186 Emergency Services Uniform Apparel for The Port Authority Police Department - 3 Year Requirements Contract
16209 Vehicle Oil and Lubricants for Supply and Delivery to Various Port Authority Facilities - Two Year Requirements Contract
16217 Application and Removal of Thermoplastic Reflectorized Pavement Markings at Various Port Authority Facilities - Two Year Contract with Option
16247 Sheet Metal Items, as Specified, to be Furnished & Delivered to All Port Authority Stockrooms in NY & NJ - One Year Requirements Contract
16180 Infrared Camera with Accessories and Training for PATH
16047 Various Safety Supplies and Apparel, Including Gloves, Insoles, Glasses and Warning Flags - Two Year Requirements Contract
16181 Delineator Curbing Manufactured by Dura Curb - Two Year Requirements Contract
16117 Maintenance, Inspection, Repair and Emergency Services for Various HVAC, Mechanical, Electrical and Fire Protection Systems at Newark Liberty International Airport, Monorail Control Facility. Two-Year Requirements Contract with Options.
15973 One Railroad Track Tamper
16106 Check Cashing Services at the Harrison Car Maintenance Facility
15716 Electrical Maintenance and Repair of Sewerage Lift Stations at Newark Liberty International Airport - Three Year Requirements Contract
15916 Fiber Optic Service at Port Authority Airports
15972 One Railroad Tie Handler
15708 Ballast Removal - PATH
15950 Provide Services to Perform Chest PA and Lateral X-Rays for the Port Authority - One Year Requirements Contract
15955 One Railroad Tie Inserter and One Remover
15875 Flashlights: Proton-Pro Model # PPROUV, as Manufactured by LRI or Approved Equal
15825 Call-in Roof Repair Services at Newark Liberty International Airport
15698 Three Year Maintenance Contract for Five (5) Man-Lifts Located at Newark Liberty International Airport
15701 Aluminum Tool & Supply Carts for Use on Railroad Tracks. Model ATS-1 as Manufactured by The Nolan Company (or Port Authority-approved Equal). Furnish & Deliver to Jersey City, NJ
15415 Elevator, Escalator, and Lifts Maintenance and Repair Services at LaGuardia Airport
15412 Elevator, Escalator, and Lifts Maintenance and Repair Services at John F. Kennedy International Airport, the Airtrain Jamaica Terminal Complex, and the Downtown Heliport
15462 Boiler Cleaning Services at Newark Liberty International Airport
15213 Safety and Security Vests as per PATH ANSI Specifications
15377 Hardwood Timber Ties
15049 Weed Control at PATH Facilities - 3 Year Contract
15198 Portable Toilets at the Taxi Stack Area at Newark Liberty International Airport - One Year Contract
15109 Furnish and Install Glass at Various LaGuardia Airport Buildings - Two Year Contract
15097 Delineator - Yellow Safe Hit Post, Base, and Epoxy
15004 Aerial Photography of Airports
14791 Provide and Deliver Port Authority Police Department Uniforms and Accessories - 3 Year Contract
14668 Inspecting, Diagnostic Testing, Maintenance and Repair Services of BTU Meters and Combustion Control Devices System, Transmitters and High Temperature Hot Water Generator Safety Devices at Newark Liberty International Airport (EWR)


Preliminary Bid Results Construction Solicitations

Contract/Solicitation Contract Title/Solicitation Description
JFK-1019 JOHN F KENNEDY INTERNATIONAL AIRPORT - DELAY REDUCTION PROGRAM - TAXIWAY FB EXTENSION - ZA TO E
TP-564.012 TELEPORT - TELECENTER BUILDING NO. 5 FIRE ALARM SYSTEM UPGRADE
JFK-974.610 JOHN F KENNEDY INTERNATIONAL AIRPORT - BUILDING 14 OVERHEAD DOOR REPLACEMENT
EWR-913.706 NEWARK LIBERTY INTERNATIONAL AIRPORT - PARKING GARAGE P4 ELEVATOR LOBBY DOORS
AK-183 STATEN ISLAND BRIDGES - FIRE HYDRANT SYSTEM UPGRADE
LT-524 LINCOLN TUNNEL - RESURFACING OF WESTBOUND HELIX LANE 4
SWF-005 STEWART INTERNATIONAL AIRPORT - REHABILITATION OF SANITARY SEWER
EWR-910.506 NEWARK LIBERTY INTERNATIONAL AIRPORT - NORTHEAST CORRIDOR AIRTRAIN STATION ROOF REPLACEMENT AND REPAIRS
JFK-1009 JOHN F. KENNEDY INTERNATIONAL AIRPORT - BUILDING 60 TWA FLIGHT CENTER ADAPTIVE RE-USE - PHASE I INTERIM INTERIOR RESTORATION
HH-634.002 HOWLAND HOOK MARINE TERMINAL - PORT IVORY - PHASE 1C NORTH SITE SURCHARGE
PN-800.219 PORT NEWARK - BERTHS 36 AND 63 AND WHARF RECONSTRUCTION
JFK-1016 JOHN F KENNEDY INTERNATIONAL AIRPORT - TAXIWAY J HOLD BAR
TEB-144.012 TETERBORO AIRPORT - REHABILITATION OF TAXIWAY A APRON
JFK-974.705 JOHN F KENNEDY INTERNATIONAL AIRPORT - CATHODIC PROTECTION REPAIRS - SATELLITE FUEL FARM AND FUEL TRANSFER LINES
PN-954.706 PORT NEWARK - HIGHWAY-RAIL GRADE CROSSING SAFETY UPGRADES
WTC-724.078 WORLD TRADE CENTER - VEHICULAR SECURITY CENTER AND TOUR BUS PARKING FACILITY - EXTERIOR PERIMETER FOUNDATION WALLS
EWR-154.047 NEWARK LIBERTY INTERNATIONAL AIRPORT - REPLACEMENT OF TRANSFORMERS AT CHRP SUBSTATION - BUILDING 46
EWR-910.540 NEWARK LIBERTY INTERNATIONAL AIRPORT - SOUTH FUEL FARM FIRE PROTECTION SYSTEM UPGRADE
EWR-910.533 NEWARK LIBERTY INTERNATIONAL AIRPORT - 2006 PRIORITY REPAIRS OF BRIDGES
LGA-924.603 LAGUARDIA AIRPORT - CENTRAL TERMINAL BUILDING - ARRIVALS LEVEL WATER DAMAGE REMEDIATION
MFB-100.527 HOLLAND TUNNEL AND STATEN ISLAND BRIDGES - IMMEDIATE REPAIRS
SWF-164.007 STEWART INTERNATIONAL AIRPORT - LONG TERM PARKING LOT EXPANSION AND STEWART BOULEVARD REALIGNMENT
PN-910.571 PORT NEWARK - CORBIN AND TYLER STREET INTERSECTION IMPROVEMENTS
SWF-164.010 STEWART INTERNATIONAL AIRPORT - REHABILITATION OF WEATHER INSTRUMENT POWER (WIP) CIRCUIT
LT-460A LINCOLN TUNNEL - NEW JERSEY VENTILATION BUILDINGS EXTERIOR RENOVATION AND ROOF REPLACEMENT
LGA-747 LAGUARDIA AIRPORT - REPLACEMENT OF CTB CONCOURSE HVAC SYSTEM
EWR-154.018 NEWARK LIBERTY INTERNATIONAL AIRPORT - TAXIWAY FILLET IMPROVEMENTS
EWR-154.033 NEWARK LIBERTY INTERNATIONAL AIRPORT - SWITCH HOUSE NO. 2 MODIFICATIONS
BP-651.020 BROOKLYN-PORT AUTHORITY MARINE TERMINAL - PIER 9A NORTH AND PIER 10 MAINTENANCE DREDGING
PN-954.700 PORT NEWARK - DEMOLITION OF BUILDING 291